1/15/21 - "Thank you for helping us out with the Marysville Fire Rescue Boat House and Hoist project. I'm glad we do business together! Nice Job!" Craig L GC Owner
10/2020 Cam Magazine article regarding Christian Financial Credit Union, one of CAMs 12 most outstanding construction projects of the past year - According to Fountain, the building’s makeup includes poured and formed concrete foundations and a structural steel frame. Campbell & Shaw Inc.’s use of an innovative CNC structural steel fabrication technology benefited this phase of the project. “The machine helped to speed up the fabrication process,” Van Peteghem said. “Chris (Phelan) and I went to Campbell & Shaw’s facility to see the equipment in operation. It is amazing.” CAM Magazine’s February 2019 edition offers more detail: Campbell & Shaw Steel, Inc., Marysville, installed a fully automated FICEP 1103 CNC three-spindle drilling, layout and sawing structural steel processing production line. The new CNC machine automatically loads the structural steel members from the infeed conveyor onto the processing rollers, drills the correct hole size from a six-bit tool selection for each spindle that automatically changes the tooling, lays out the member with piece marks, and then cuts the material to length with up to a 60-degree bevel cut. After the material is processed, it is transferred to the outfeed conveyor for final fabrication. According to Campbell & Shaw Vice President Mark Lietke, “This machine is capable of running lights out, meaning that our crew can program it, load it up prior to quitting time, and return in the morning to pre-processed steel ready for fabrication.” Content Courtesy of CAM Magazine
7/10/20 - "You guys are the best. Anytime I've needed something, I know I can count on you. I love you guys, your the greatest." Joe S. President, Waterford
6/22/20 - "Your steel fit like a glove, I didn't have to modify anything. Thanks for coming out to field measure my project. I wish all of them went this smoothly." Buck M. PM, Port Huron
3/20/20 - "Thanks for taking care of the Captain Kool project for us. You guys always do a nice job and we appreciate the quality with your work." Jim P. PM, Roseville
12/24/19 - "Thanks for the quick response and the great communication on the additional material that was needed at the Galloup project." Kirk S. PM, Clinton Township
12/5/19 - "Our team loves the work that your team did on the stairs and rail at the Clarifier, keep up the good work." Alan K. Supervisor, Domtar Paper, Port Huron
10/9/19 - "You guys are great, thanks for the quick turnaround on the added lintels and the modifications that were needed on the canopy." John G. Superintendent, Galloup Project, Clinton Township.
5/24/19 - "Just thought I'd call to let you know that everyone was extremely satisfied with the work that you did last night for the repair work that was urgently needed at the mill with such short notice right before the holiday. Your team did a great job." Keith F. Project Structural Engineer, Domtar Paper, Port Huron
5/2/19 - "Everything went well at the AT&T Walled Lake job. I appreciate your help with this project." Mike S. PM
1/24/19 - "We really like working with Campbell & Shaw Steel. It has been great to work with Mike Kepsel in particular. I usually have to do a lot of the work for other fabricators PM's. Mike is always on top of things which is so greatly appreciated and quite frankly a relief." Jeremy B. PM for Saint Gobain Performance Plastics, Beaverton
8/25/18 - "We really appreciated the fact that your team always stepped up to the needs and demands of our project. That is what team work is all about!" Dan D. PM, Brose addition, New Boston
4/10/18 - "We hired Campbell & Shaw Steel to fabricate the required steel for our new construction project. Mark and his team were exceptionally friendly and helpful throughout the entire process. Their pricing, lead-time and quality of work were all on point. I would highly recommend using these guys for all your steel needs." Tom O. Owner
3/2/18 - "Thanks, we appreciate your diligence and hard work!" Nick S. VP for GC, Harbor Freight Tools, Chesterfield
11/28/17 - "Brian did a great job yesterday at Auria. Thanks for helping us out with our project with them. Thanks again," Todd R. Senior Machine Designer
11/21/17 - "Thank you very much for the nice work on our project at 36310 Main Street in New Baltimore. Happy Thanksgiving to you guys." Tom F. Owner
10/5/17 - "What defines you as one of our subcontractors is not problems but how you handle a problem for your customer. So far thumbs up! Our president wanted me to tell you he likes the way you are handling things at our project. We want solutions to problems not excuses. The way you are stepping up to the plate goes a long way with our company." Duane B. PM Oerlikon Metco, Plymouth
9/18/17 - "Your team did a great job on the Huron Manufacturing project in Lexington. You helped us get a 40,000 square foot addition complete in less than 6 months." Robert K. Supervisor
8/16/17 - "Thanks for all your help on this project! We are very satisfied with your perfomance and workmanship." Josefin V. Senior Project Coordinator and Scott D. Project Manager for Arvin Sango, Inc. North American Tech Center, Whitmore Lake
7/19/16 - "You guys did a very good job out there, very professional and we really like working with you." Mike D. Construction Manager, Veterans Administration Medical Center - Clinical Support and Logistics 3 story addition, Ann Arbor